Road to LeVeque

LeVeque-Aged.jpg
LeVeque-Aged.jpg

Road to LeVeque

from 24.99

This is an abandoned bridge originally designed to be a ramp from Mound Street to I-70 West. The project was abandoned when a seperate ramp was constructed at Civic Center Drive and 2nd Street to accommodate the Miranova Place project in the 1990’s. According to the Ohio Department of Transportation, the bridge is set to come down in 2020 due to the reconstruction of I-70 & 71.

Size:
Product Type:
Quantity:
Add To Cart

This is an abandoned bridge originally designed to be a ramp from Mound Street to I-70 West. The project was abandoned when a seperate ramp was constructed at Civic Center Drive and 2nd Street to accommodate the Miranova Place project in the 1990’s. According to the Ohio Department of Transportation, the bridge is set to come down in 2020 due to the reconstruction of I-70 & 71.